Every job below is one we do ourselves across Newark.
We frame new decks with pressure-treated joists on footings poured below the frost line, which around Newark means at least 36 inches down. Ledger boards get flashed properly where they meet the house so water doesn't track behind the siding.
We'll lay out multi-level decks, built-in benches, or a deck that wraps around an existing tree if that's what the yard calls for. You get a plan with real board direction and footing locations before any lumber shows up, not just a sketch.
Composite boards from Trex or TimberTech don't require staining and won't splinter, which matters if you've got kids running around barefoot. We still frame underneath with the same joist spacing and hidden fasteners, since composite still relies on the same solid framing underneath.
Sagging deck, soft spot near the stairs, a railing post that's gone loose, that's the bulk of our repair calls. We cut out the rotted framing and splice in new lumber rather than just face-screwing a board over the problem.
If the joists are undersized, spaced wrong, or the beam is sagging in the middle, resurfacing on top won't fix it. We sister new joists next to failing ones or rebuild the beam and posts so the deck can actually carry snow load and a full table of people.
We power wash first to pull out the gray and the mildew, then let the wood dry a few days before staining. An oil-based semi-transparent stain holds up better around here than a film-forming sealer, which tends to peel once water gets under it.
Baluster spacing has to stay under 4 inches to meet most local codes, and a lot of older decks don't. We rebuild railings to spec and anchor posts into the framing instead of just the decking boards.
If the frame underneath is still sound, we can pull off the old decking and replace just the boards and railings. It's a faster, cheaper way to get a deck looking new again without a full rebuild.
Old decks come down board by board, and we haul the lumber and any buried concrete footings off site. Worth doing right if you're clearing the way for a bigger build or a patio instead.
A pergola or shade structure attaches into the same framing as the deck below it, so it has to be planned for the load, not bolted on as an afterthought. We build these alongside a new deck or add them to an existing one if the frame can handle it.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Deck installation and repair covers Newark and roughly a 50-mile radius around it.
Questions that tend to come up once a deck project is underway.
Describe the problem and we will tell you what it probably is. No obligation.